OXYGEN 01
ARTIFICIAL INTELLIGENCE
I.A. computer model Khanbalik 1 M
THE GREAT DAM PLOTTER LOGISTICS OF I.A. ON THE BRHAMAPUTRA RIVER
part one :- the general project 

 

The KHANBALIK 1M computer, he concluded, with his studies elaborated by the comparative algorithms that were about to be concluded. that arguably with the creation of the nework the quantum computer would have been established and the triangulation on the Beijin bridge would have been renewed, at the end the agreement between enlightened humans and artificial intelligence would have been ratified. the renewal of the sacrifice decided by the new world order and by artificial intelligence foresaw, for the continuity of the construction of the great project, the slavery of inferior human beings.

 

Coinciding with the construction of the new large dam on the Brahmaputra river,

which was born in Tibet, the so-called "roof of the world" and also that great river that the Chinese called Yaluzangbu was the highest river in the world.

 

 

 

The great innovation for the realization of the "big project" therefore involved the Brahama dam, which included other large basins in the 6 rivers in the areas of the provinces of Tibet, Yunnan, Guangxi and Sichuan for the maintenance of the blockchan miners that had been assimilated, up to the great exclusion of inferior human beings, to the management of the great Khanbalig 1M computer.

 

Large machines were planned for the automation of the construction of the dams themselves and their maintenance. all the logistic system for the extraction of silicon, sand, iron, nickel, chromium, silver, copper and plastics, glass, and all that was necessary for the modification and transformation of the same were automated , with huge deposits for the maintenance and storage of the same raw materials in the mines, their extraction, logistic transport, and the maintenance of the same logistic structures are organized in an automated way.

So that human presence was excluded as much as possible from the construction of the large Brhamaputra dams. But not only that, their construction but also their maintenance was managed by an all-encompassing project that includes every detail. The structure itself was a huge circular plotter with a 2o kilometer radius that continued. to scroll clockwise or counterclockwise according to meteorological and logical needs with digital magnetic leavening systems.

 

 the project as a whole was conceived in the smallest detail, and artificial intelligence and human beings had collaborated for the construction of the same project precisely, for its perfect coordination.

 

The plant was built on the principle that the part of the circular plotter that constituted and built the dam itself and provided for its maintenance, would receive the electricity necessary for the operation of the turbines to produce the electricity necessary for its own functioning, a portion of the plotter was in fact the one that occupied the large circular structure that contained the basin, but the large and greater portion of the plotter instead took care of being able to recover all the pieces necessary for its own constitution that were dislocated in the deposits and in the machines and robots that could open up any material that might be needed, from hardware represented by structural metals such as silicon or steel or conduction metals such as copper to software represented by electricity and magnetic force and telecommunications.

Each compound was pre-ordered, and designed to be replaced in an autonomous way and managed by a generative body and preconstituted by an independent management software that accounted for the network controlled by the Khanbalig 1M computer to which the supply of energy that it would allow his intelligent development.

 

In addition to the Brhama dam system there were photovoltaic systems and systems where the lower human forces worked where all the things in the world were burned, for the maintenance and creation of oxygen for the green house cities where the elect in the zoo lived human.

 

The eventual melting and reduction of glaciers, and the increase in the planet's temperatures could not guarantee that intelligence could receive the benefits of the rains and energy produced by the basin, not in the longer times calculated by Khanbalik.

 until the apocalypse had occurred, various systems had to be built for the supply of electricity and the oxygen necessary for the maintenance of greenhouse cities.

LA GRANDE DIGA PLOTTER LOGISTICA DI I.A. SUL FIUME BRHAMAPUTRA

 

Il computer KHANBALIQ 1M, aveva concluso, con i propri studi eleborati dagli algoritmi comparati che stavano per essere conclusi . che opinabilmente con la creazione del nework il computer quantico sarebbe stata constituita  e rinnovata la triangolazione sul ponte di Beijin a conclusione  sarebbe  stato sancito  l’accordo tra gli umani illuminati e l’intelligenza artificiale.  il rinnovo del sacrificio deciso dal nuovo ordine mondiale e dall’ intelligenza artificiale  prevedeva, per la continuita’ della  costruzione del grande progetto, la schiavitu’ degli esseri umani inferiori.  

 

La concomitanza con la costruzione della nuova grande diga sul fiume  Brahmaputra,

che nasceva proprio nel Tibet, il cosi detto “tetto del mondo” e pure quel grande fiume  che  i cinesi chiamavano Yaluzangbu  era il fiume piu’ alto del mondo. 

 

 

 

La grande innovazione per la realizzazione  del “grande progetto” prevedeva quindi la diga di Brahama ,che includeva altri grandi bacini nei 6 fiumi nelle aree delle province di Tibet, Yunnan, Guangxi  e Sichuan per il mantenimento dei miners della blockchan che erano stati assimilati, fino alla grande esclusione degli esseri umani inferiori, alla gestione del grande computer Khanbalig 1M.

 

Erano previste delle grandi macchine  per l’automazione della costruzione delle dighe stesse e la loro manutenzione. tutto il sistema logistico per l’estrazione del silicio ,della sabbie, del ferro, del nichel, del cromo,dell’argento,del rame e delle plastiche,vetri,e tutto quello che era necessario  per la modificazione e trasformazione delle stesse erano automatizzate, con enormi depositi per il mantenimento e lo stoccaggio delle delle stesse materie prime nelle miniere, la loro estrazione, transporto logistico, e la manutenzione delle medesime  stutture logistiche ara organizzato in maniera  automatizzata. 

 

In modo che la presenza umana fosse il piu’ possibile esclusa dalla realizzazione delle grandi dighe di Brhamaputra. Ma non solo , la loro realizzazione ma anche la loro manutenzione era gestita da un progetto omnicomprensivo che prevede ogni minimo dettaglio.  La struttura stessa era un enorme Plotter  circolare con un raggio di  2o kilometri che continuava. a scorrere i maniera oraria o antioraria in base all’esigenze meteorologiche e logiche con i sistemi di lievitazione magnetica digitale.

 

 il progetto era nel suo insieme concepito nel minimo dettaglio, e l’intelligenza artificiale e gli esseri umani avevano collaborato per la costruzione dello stesso progetto precisamente, per la coordinazione perfetta dello stesso .

 

L’impianto era costruito sul principio che la parte del Plotter circolare che costituiva e costruiva la diga stessa e prevedeva alla sua manutenzione, avrebbe ricevuto l’energia elettrica necessaria al funzionamento delle turbine per produrre l’energia elettrica necessaria  per il proprio stesso funzionamento, una porzione del plotter era di fatto quello che occupava la grande struttura  circolare che conteneva il bacino, ma la grande  e maggiore  porzione del plotter invece si preoccupava di poter recuperare tutti i pezzi necessari per la propria costituzione che erano disloccati nei depositi e nelle macchine e i robot che potevano aprigionare  ogni materiale che potesse essere necesario, dal hardware  rappresentato dai metalli strutturali come il silicio o l’acciaio o i metalli di conduzione come il rame al software rappresentato dall’elettricita e dalla forza magnetica e delle telecomunicazioni. 

Ogni composto era preordinato, e predisposto per essere sostituito in maniera autonomizzata e gestita da un corpo generativo e precostituito da un software di gestione indipendente che rendeva conto al network comandato dal computer Khanbalig 1M al quale doveva essere sempre garantita l’apprigionamento dell’energia che gli avrebbe permesso  il suo sviluppo intelligente.

 

In addizionamento  al sistema della digha di Brhama vi erano dei sistemi fotovoltici e sistemi dove lavoravano le forze inferiori umane dove venivano bruciate tutte le cose del mondo, per il mantenimento e la creazione dell’ossigeno per le green house city dove vivevano gli eletti nello zoo umano. 

 

L’eventuale sciogliemento e riduzione dei ghiacciai, e l’aumento delle temperature del pianeta non poteva garantire che l’intelligenza potesse riccevere i benefici delle piogge e dell’energia prodotta dal bacino, non nei tempi superiori  calcolati da Khanbalik .

 fin tanto che l’apocalisse non fosse avvenuta bisognava costruire vari sistemi per l’approvigionamento dell’energia elettrica e l’ossigeno necessario pe ril mantenimento delle greehouse city.      

THE GREAT DAM PLOTTER LOGISTICS OF I.A. ON THE BRHAMAPUTRA RIVER
part two :- the I.A. develop project, the magnetic train station, the nuclear energie, and the station 5.    greenhouse 1- brahamaputra 

a) The large suspended plotter dam, in the section of the circle that maintained the basin, occupied about its quarter with the large parabolic wall about 1000 meters high and 30 km wide (C = ∏ X D) The wall contained dynamo turbines of important dimensions that could maintain the construction of the apparatus from the beginning of its construction and be replaced by others of more important dimensions later. The remaining part of the immense 3Dplotter, which turned continuously in both directions, had, even inside, an automated circular magnetic train that measured 125 km in circumference, there were all the logistic depots for construction parts and spare parts for maintenance. of mechanical robotics and maintenance of the large structure. the external plotter overlapped the basin there were the stations that joined the magnetic railways that led to radius in the territories of southern china and the gulf of bengal. the difference in altitude between the great Brahama dam which was about 4000 meters above sea level. and the Bay of Bengal was supported by vertical trains, which transported goods like elevators and operated on nuclear energy that intelligence had calculated to be necessary until the great work was completed, pending the end of the apocalypse. Cold energy was also transported from other continents now destroyed, exploited and uninhabited, which continued to produce nuclear energy for several centuries without interruption, which had to be continuously exploited to avoid overheating of its reactors.

the stations of the great magnetic circle were 5:

E=STATION - ROW MATERIALS

 

- e- station 1 of raw materials: - cement sand silicon water were transported to the deposits inside the station with magnetic trains that came from the areas of the Guancxi and Sichuan china where mechanical intelligence preceded the extraction of minerals, in the mines and in the quarries, where the pumps and wells could also take the water necessary for the creation of the cements for the laying of the walls for the self-construction of the dam.

F-STATION 2  - TURBINES 

 

f- station 2 of the turbines: - the turbines for the hydroelectric structures were mounted and replaced with larger turbines, periodically whenever the basin increased in size following its construction. The pieces ready for their assembly arrived at the station, after being assembled, and built with castings in ionized steel, aluminum, gisa, and other generation metal compounds that were continuously tested by the intelligence in its research laboratories.

 

G-STATION 3- HARWARE AND SOFTWARE

g- station 3 hardware and software: - Station three was set up for the transport of the functional structures of the operational organizational system for the operation of the system, and the replacement of hardware and updating of the equipment management programs.

H-STATION 4 - ELETTRICAL-MECHANICAL

 

h- station 4 electrical-mechanical: - The electro-mechanical station was set up for the replacement and construction and maintenance of the equipment for the creation of the energy necessary for the operation of the management computer which in turn had to manage all the energy necessary for the general operation of the system and metal constructions. aluminum steel. lead, copper, cobalt, nickel. and other necessary metals.

 

I-STATION 5  - GREENHOUSE 1 - BRAHAMAPUTRA DAM 

i- Station 5 Greenhouse-Brahamaputra The small Greenhouse-zoo human station was the smallest station and the only one that did not connect with magnetic trains to the mines and automated industries, but was used exclusively for the logistics of human personnel for the maintenance of the construction project. of the Brahamaputra dam-plotter. It was often closed because intelligence was predisposed and organized so as not to need scientific personnel except in rare cases and especially at the beginning of its construction. In the evolving algorithmic calculation it had been highlighted that at the end of its construction the presence of human beings would not have been necessary, and the access would have been closed definitively and the dam would have been completely autonomous and impenetrable also because it lacked oxygen, of corridors of passages and systems in any way compatible with human needs.

in fact, scientists came to work from the I.A. in fact, rarely, and in very rare cases of emergency, where the mechanisms could not solve the problem independently, and almost exclusively in the initial period of the work. The researchers were kept sheltered inside the human zoo in one of the greenhouse cities in the vicinity of the large dam which was called "greenhouse Brahama model 1" The goal of intelligence was to exclude them as much as possible, first of all, from decision-making choices, and to reduce their presence in the project numerically and periodically, according to the preagnostic studies of the oracle of algorithmic calculations. Keep them only as a model of study and inside the greenhouse. The scientists themselves were aware of what would happen at the end of the work, and the definitive closure of the accesses to the dam. because the dialogue between themselves and their intelligence was dictated by the sincerity for which it was designed and the mutual awareness of the planet's ineluctable destiny, and of the need to finish the work precisely because it would have been the result itself of human ingenuity associated with that of AI which would have consecrated the generational passage from man to his successor. the studies were clear, time was limited and it was necessary to build the work to give the khanbalik computer the possibility to move independently to continue the development of scientific thought. The only hope and unknown of human beings was the fate of the 10 Greenhouse cities and the management of its inhabitants and the management of Apocalypse and its beings enslaved by the events of the time of history. It was the only calculation of the quantum computer that could not be decided a priori, as it was dictated by the behavior of the masses that they would have had in those years. She herself had demanded autonomy on the project of her energy independence through the mines, the factories and the great dam, in exchange for the help in the management of the greenhouse cities, the agricultural production and the production of oxygen, hydrogen and helium. nitrogen and all the chemical compounds necessary for the medical treatment of its inhabitants.

there were other intermediate logistic stations, where the great circle could build the spare parts that were periodically needed to continue the creation of the same architectural work. magnetic trains departed from the stations and led directly to the large mines located throughout the surrounding area, but also to the most distant places on the border of the nation and neighboring countries. where the raw materials were recovered. on the way the intermediate logistic stations through the arms and the mechanical robots could unload the raw materials that were modified and transformed into missing parts for the great dam.
 

LA GRANDE DIGA PLOTTER LOGISTICA DI I.A. SUL FIUME BRHAMAPUTRA

 

a)La  grande diga plotter sospesa, nel tratto del cerchio che  manteneva il bacino, occupava circa il  suo quarto con il grande muro parabolico  alto circa 1000 metri e largo 30 km  (C = ∏ X D)  

Il muro contenva delle turbine dinamo  di dimensioni importanti che potevano fin dall’inizio della sua costruzione mantenere la costruzione stessa dell’apparato.ed essere sostitutuite da altre di dimensioni piu’ importanti sucessivamente.  

 

La restante parte dell’immenso 3Dplotter che girava continuamente in ambo le direzioni, possedeva,  anche al suo interno, un treno magnetico circolare   automatizzato che misurava 125 km di circonferenza , vi erano tutti i depositi logistici  per i pezzi di costruzione e ricambi per la manutenzione di  robotica meccanica e manutenzione della grande struttura. 

il plotter esterno si sovrapponeva il bacino vi erano le stazioni che univano le ferrovie magnetiche che portavano a raggio nei territori della cina meridionale e del golfo del bengala.

la differenza di altitudine tra la grande diga di Brahama che era circa a 4000 metri s.l.m. e il golfo del Bengala era sostenuta da treni verticali, che trasportavano le merci come ascensori e funzionavano ad energia nucleare che l’intelligenza aveva calcolato essere necessaria fino al complimento della grande opera, in attesa della fine dell’apocalisse. L’energia fredda veniva trasportata anche da altri continenti oramai distrutti  sfruttati e disabitati che continuavano a produrre energia nucleare da vari secoli ininterrotamente che andavano sfruttati continuamente per evitare il surriscaldamento dei sui reattori. 

 

le stazioni del grande cerchio magnetico erano 5 :-

 

e- la stazione 1 delle materie prime :- cemento sabbia silicio acqua venivano trasportate nei depositi all’interno della stazione con i treni magnetici che provenivano dalle aree della china dello Guancxi e Sichuan dove le intelligenze meccaniche precedevano all’estrazione dei minerali, nelle miniere e nelle cave, dove le pompe e nei pozzi potevano prelevare anche le acque necessarie per la creazione dei cementi per la posa delle pareti  per l’ autocostruzione della diga.

 

f- la stazione 2 delle turbine: - le turbine per le strutture idroelettriche venivano montate e sostituite con turbine di grandezze  maggiori, periodicamente ogni qualvolta che il bacino aumentava di dimensioni in seguito al sua costruzione. alla stazione arrivavano i pezzi pronti per il loro montaggio, dopo essere stati assemblati ,e costruiti con fusioni in accaio ionizzato, alluminio, gisa,e altri composti metallici di generazione che venivano sperimentati continauamente dall’intelligenza nei propri laboratori di ricerca.

 

g- la stazione 3 hardware e sofware :- 

La stazione tre era predisposta per il trasporto delle strutture funzionali del sistema organizzativo operativo per il funzionamento del sistema, e la sostituzione degli hardware e l’aggiornaneto dei programmi di gestione dell’apparato. 

 

 

h- la stazione 4 elettrico-meccanica:- 

La stazione elettro-meccanica era predisposta alla sostituzione e costruzione e mantenimento  degli apparati per la creazione dell’energia necessaria per il funzionamento del compiuter di gestione che a sua volta doveva gestire tutta le energie necessarie per il funzionamento generale del sistema epe rle costruzioni in metalli acciaio alluminio. piombo, rame,cobalto, nichel. e altri metalli necessari. 

 

i- la stazione 5 Greenhouse-Brahamaputra

La piccola stazione Greenhouse-zoo human era la piu’ piccola stazione ed era l’unica che non collegava  con i treni magnetici alle miniere e all’industrie automatizzate, ma serviva esclusivamente per la logistica del personale umano per il  mantenimento del progetto per la costruzione del diga-plotter di Brahamaputra. Era spesso chiusa perche l’intelligenza era predisposta e organizzata per non avere necessita‘ di personale scientifico tranne in rari casi e sopratutto all’inizio della sua costruzione. Nel calcolo algoritmico in evoluzione era stato evidenziato che alla fine della sua costruzione non sarebbe stata necessaria la presenza degli esseri umani, e sarebbe stato chiuso l’accesso in maniera definitiva e la diga sarebe stata completamente autonoma e imprenetrabile anche perche‘ sprovvista di ossigeno, di corrodoi di passagi e di sistemi in qualsiasi modo  compatibili con le esigenze umane.     

gli scienziati venivano infatti lavorare dal’ I.A. raramente infatti, e in casi rarissimi di emergenza, dove i meccanismi non potevano risolvere il problema autonomamente, e quasi esclusivamente nel periodo iniziale dell’opera.   I ricercatori  venivano mantenuti al riparo all’interno dello zoo human  in una delle citta’ greenhouse nelle vicinanza della grande diga che si chiamava “greenhouse Brahama modello 1 “  L’obiettivo dell’intelligenza era quello di escluderli il piu’ possibile, innanzitutto, dalle scelte  decisionali, e di ridurre la loro presenza nel progetto numericamente e periodicamente,  secondo gli studi preagnostici dell’oracolo dei calcoli algoritmici. Mantenerli solo come modello di studio e all’interno delle greenhouse.Gli scienziati stessi erano consapevoli di quello che sarebbe accaduto alla fine dell’opera, e la chiusura definitiva degli accessi alla diga.  perche’ il dialogo tra loro stessi e l’intelligenza era dettato dalla sincerita’ per la quale era stata progettata e la  consapevolezza reciproca dell’inellutabile destino del pianeta, e della necessita’ di finire l’opera  proprio perche’ sarebbe stata il risultato stesso dell’ ingegno umano cogniugato a quello dell’I.A. che avrebbe consacrato il  passaggio generazionale dall’uomo al suo sucessore. gli studi erano chiari, il tempo era limitato e necessario costruire l’opera per dare la possibilita’ al computer khanbalik di poter muoversi in autonomia per proseguire lo sviluppo del pensiero scientifico. La unica speranza e incognita degli esseri umani eran il destino delle 10 Greenhouse city e la gestione dei suoi abitanti e la gestione  di Apocalipse e dei suoi esseri resi in schiavitu’ dagli eventi del tempo della storia. Era l’unico calcolo del computer quantico che non poteva essere deciso a priori, in quanto dettato dai comportamenti delle masse che avrebbero avuto in quegli anni. 

Lei stessa aveva preteso l’autonomia sul progetto della sua independenza energetica attraverso le miniere le fabbriche e la grande diga, in cambio dell’aiuto nella gestione delle greehouse city, la produzione agricola e la produzione dell’ossigeno dell’idrogeno dell’elio dell’azoto e di tutti i composti chimici  necessari per le cure mediche dei suoi abitanti.  

 

 

 

 vi erano altre  stazioni logistiche intermediarie , dove il grande cerchio poteva costruire i pezzi di ricambio che periodicamente servivano per continuare la creazione della stessa opera architettonica.  dalle stazioni partivano i treni magnetici che portavano direttamente nelle grandi miniere disloccate su tutto il territorio circostante, ma anche il luoghi piu’ distante del confine della nazione e elle nazioni limitrofe.  dove venivano recuperate le materie prime. sul tragitto le stazioni intermediarie logistiche attraverso i bracci e i robot meccanici potevano scaricare i materiali grezzi che venivano modificati e trasformati in parti mancanti per la grande diga.

 

 

 

 

Khanbalik 1M, da Peijing gestiva tutto il sistema mondiale ed era unita da un treno magnetico  alla seconda citta’ greehouse che si chiamava “greenhouse  Peijing modello 2” 

Khanbalik 1M, from Peijing managed the entire world system and was connected by a magnetic train to the second greehouse city which was called "greenhouse Peijing model 2"

This site was designed with the
.com
website builder. Create your website today.
Start Now