top of page
F- STATION 2 - TURBINES
F-STATION 2 - TURBINES
f- station 2 of the turbines: - the turbines for the hydroelectric structures were mounted and replaced with larger turbines, periodically whenever the basin increased in size following its construction. The pieces ready for their assembly arrived at the station, after being assembled, and built with castings in ionized steel, aluminum, gisa, and other generation metal compounds that were continuously tested by the intelligence in its research laboratories.




DAMS IN BRAHMAPUTRA RIVER
PROJECT BRAHMAPUTRA
COMPUTER MODEL KHANBALIK 1M BB ADIVISER
brahmaputra dam
O X Y G E N
bottom of page